FAVOURABLE REPORT TO BUILD A WATER TREATMENT PLANT
4 REASONS TO IMPLEMENT SALTWATER CHLORINATION IN COLLECTIVE POOLS
1 Outubro, 2020
Piscina Camping
SALT WATER CHLORINATOR SYSTEMS IN CAMPSITE SWIMMING POOLS
12 Novembro, 2020
4 REASONS TO IMPLEMENT SALTWATER CHLORINATION IN COLLECTIVE POOLS
1 Outubro, 2020
Piscina Camping
SALT WATER CHLORINATOR SYSTEMS IN CAMPSITE SWIMMING POOLS
12 Novembro, 2020

FAVOURABLE REPORT TO BUILD A WATER TREATMENT PLANT

Today we are talking about a news item that was published on 8 September by the newspaper Diario Sur.

The construction of a water treatment plant is undoubtedly good news. As stated in this article, this plant will provide drinking water to an entire municipality (Fuente de Piedra) by drawing it from a natural well that until now provided water that was unsuitable for consumption.

The link to access the full article is as follows:

https://www.diariosur.es/interior/proyecto-planta-tratamiento-20200908133527-nt.html

At Innowater, we welcome the news and we will follow up on its construction, which is expected to be completed by the end of 2020.

If you want to enjoy all the benefits offered by our equipment and water treatment systems, you can find out more by visiting us at www.innowater.es.

Deixe um comentário

O seu endereço de email não será publicado. Campos obrigatórios marcados com *

  He leído y acepto la política de privacidad

INFORMACIÓN PROTECCIÓN DE DATOS DE INNOWATER SL

  • Finalidades: Publicar su comentario en el blog de la página web.
  • Derechos: Puede retirar su consentimiento en cualquier momento, así como acceder, rectificar, suprimir sus datos y demás derechos en clientes@innowater.es.
  • Información Adicional: Avisos Legales.